Received Date:2020-11-06
Download
2021 NO.01
In order to optimize the investment and operating benelits, the cost present value method and MATLAB software were used for mathematical calculations to compare and select the pipe diameters for a drainage pipeline project in a new pumping station. The results showed that if the pumping station operated for 30 years with water flow rates of 30000, 45000, and 60000 m3/d, pipeline with nominal diameter of 800 mm was more economical and can effectively deal with the project investment benefitproblem caused by the uncertainty of sewage flow rate.
Close-CHEN Yi. Comparison and selection of pipe diameter in sewage pipeline project based on MATLAB[J]. Energy Environmental Protection, 2021, 35(1): 34-38.