Home > Article > 2021 > 01

Article

Comparison and selection of pipe diameter in sewage pipeline project based on MATLAB

Received Date:2020-11-06

Download Download 2021 NO.01

    Abstract:In order to optimize the investment and operating benelits, the cost present value method and MATLAB software were used ... Open+
    Abstract:

    In order to optimize the investment and operating benelits, the cost present value method and MATLAB software were used for mathematical calculations to compare and select the pipe diameters for a drainage pipeline project in a new pumping station. The results showed that if the pumping station operated for 30 years with water flow rates of 30000, 45000, and 60000 m3/d, pipeline with nominal diameter of 800 mm was more economical and can effectively deal with the project investment benefitproblem caused by the uncertainty of sewage flow rate.

    Close-

    Authors:

    • CHEN Yi

    Units

    • Putian Water Purification Co., Ltd., Putian 351100, China

    Keywords

    • Sewage pipeline
    • MATLAB
    • Pipe diameter
    • Comparison and selection

    Citation

    CHEN Yi. Comparison and selection of pipe diameter in sewage pipeline project based on MATLAB[J]. Energy Environmental Protection, 2021, 35(1): 34-38.

    Relate Article

    Add: No.288, Gongxiu Road, Xiaoshan District, Hangzhou City, Zhejiang Province.
    Post Code: 311201
    Tel: 0571-82989702, 19558121964
    E-mail: office@eep1987.com
    Website Copyright © Editorial Department of Energy Environmental Protection 京ICP备05086979号